SWMM 5 Leaping Weir Example

Subject:  SWMM 5 Leaping Weir Example

 

The attached example shows one way how SWMM 5 RTC Rules can be used to have the low flow go down a leaping weir orifice and the high flow go over the weir to the downstream section of the sewer. 

 

Image001

 

leaping_weir.INP Download this file

You need to be a member of SWMM 5 or SWMM or EPASWMM and SWMM5 in ICM_SWMM to add comments!

Join SWMM 5 or SWMM or EPASWMM and SWMM5 in ICM_SWMM

Email me when people reply –