SWMM 5, InfoSWMM, H20MAP SWMM, InfoSewer for Water Quality,Hydrology, Hydraulics
Robert Dickinson commented on Robert Dickinson's group Stream of Information
Robert Dickinson replied to Robert Dickinson's discussion How is the St Venant Equation Solved for in the Dynamic Wave Solution of SWMM 5?
Robert Dickinson left a comment for wu ze jian
Robert Dickinson posted a discussion
Robert Dickinson added a page to the group Hydraulics
Robert Dickinson's blog post was featured
Robert Dickinson posted a blog post
Robert Dickinson commented on Robert Dickinson's group Stream of Information
Robert Dickinson commented on Robert Dickinson's group Stream of Information
Robert Dickinson commented on Robert Dickinson's group Water Quality
Robert Dickinson commented on Robert Dickinson's group Water Quality
MeHa commented on Robert Dickinson's group Water Quality
MeHa posted a status
Quah Soon Tong left a comment for Esther Bergareche Auricenea
Robert Dickinson commented on Robert Dickinson's group Stream of Information
Robert Dickinson commented on Robert Dickinson's group Stream of InformationSubject: Surcharged Node and the Link Connection in SWMM 5
A surcharged node in SWMM 5 uses this point iteration equation (Figure 1):
dY/dt = dQ / The sum of the Connecting Link values of dQ/dH
where Y is the depth in the node, dt is the time step, H is the head across the link (downstream – upstream), dQ is the net inflow into the node and dQ/dH is the derivative with respect to H of the link St Venant equation. If you are trying to calibrate the surcharged node depth, the main calibration variables are the time step and the link roughness:
1. Mannings’s N
2. Hazen-Williams or
3. Darcy-Weisbach
The link roughness is part of the term dq1 in the St Venant solution and the other loss terms are included in the term dq5. You can adjust the roughness of the surcharged link to affect the node surcharge depth.
Figure 1. The Node Surcharge Equation is a function of the net inflow and the sum of the term dQ/dH in all connecting links. Generally, as you increase the roughness the value of dQ/dH increases and the denominator of the term dY/dt = dQ/dQdH increases.
Figure 2. The value of dQ/dH in a link as the roughness of the link increases.
© 2012 Created by Robert Dickinson.
Powered by
You need to be a member of SWMM5 - Stormwater Management Model to add comments!
Join SWMM5 - Stormwater Management Model