SWMM 5, InfoSWMM, H20MAP SWMM, InfoSewer for Water Quality,Hydrology, Hydraulics
Robert Dickinson commented on Robert Dickinson's group Stream of Information
Robert Dickinson commented on Robert Dickinson's group Stream of Information
Robert Dickinson added a page to the group SWMM4 Input Files
Robert Dickinson commented on Robert Dickinson's group SWMM4 Input Files
Robert Dickinson added a page to the group Blog Links
Robert Dickinson commented on Robert Dickinson's group Stream of Information
Robert Dickinson commented on Robert Dickinson's group Weather
Robert Dickinson commented on Robert Dickinson's group Weather
Robert Dickinson commented on Robert Dickinson's group Weather
Robert Dickinson posted a video
Robert Dickinson commented on Robert Dickinson's group ExtraVariables
Robert Dickinson replied to Robert Dickinson's discussion How is the St Venant Equation Solved for in the Dynamic Wave Solution of SWMM 5?
Robert Dickinson left a comment for wu ze jian
Robert Dickinson posted a discussionNote: What Node and Link Invert Elevations Does SWMM 5 Use?
SWMM 5 uses the following Node information from the user:
· Node Invert Elevation,
· The Node Rim Elevation which is the Node Invert Elevation + the Maximum node depth
· The Ponded Area when the Ponded Area option is used
· The Surcharge Depth above the Node Rim Elevation
SWMM 5 uses the following link information from the user:
· The Link Upstream Offset Depth or Offset Elevation and
· The Link Downstream Offset Depth or Offset Elevation
· The Link Maximum Depth or Diameter
SWMM 5 calculates the following information internally:
· The Pipe Crown Elevation at the upstream and downstream link nodes. The Pipe Crown is the Pipe Diameter + Link Offsets
· The Node Highest Pipe Crown Elevation,
· The Surcharge Depth above the Rim Elevation if the Node has a Surcharge Pressure Depth at the Node during the simulation,
o If the Surcharge Depth is 0 then the program will either lose the flooded water or store the flooded water during the simulation
· The Flooded Depth above the Rim Elevation if the Node uses the Ponded Area Option
o You have to enter a Ponded Area for the node AND use the Global Allow Ponding Option
SWMM 5 Rules for Pipes
· The Pipe Invert Cannot be below either upstream or downstream node invert – the program will print a warning in the rpt file and set the offset to 0 internally,
· The Pipe Crown Cannot be above the Rim Elevation of the Node – the program will raise the Rim Elevation when this happens and print a warning in the rpt file.
The use of Offset Depth or Offset Elevation for the Link Offsets is based on the user choice at the bottom of the SWMM 5 GUI Map.![]()
Or in the Tools/Preference/Operation dialog of InfoSWMM/H20MAP SWMM ![]()
© 2012 Created by Robert Dickinson.
Powered by
You need to be a member of SWMM5 - Stormwater Management Model to add comments!
Join SWMM5 - Stormwater Management Model