Note: You can copy and paste information from the Junction Output Summary to a newly created Junction Information DB Column so that you can use Map Display to visually see the newly saved output variable.

Step 1: Run the model and then go to the Junction Summary in Report Manager and select all of the nodes in your model.

Step 2: Copy the Maximum Surcharge Height over Highest Pipe Crown Column

Step 3: Make and Insert a New Editable Field in the Junction Information Table by Pasting the information you just copied from the Junction Summary Output Column.

Step 4: Use the Map Display Command and use Existing DB as the Source and the newly created variable Junction_Surcharge_Depth

Step 5: Use the Option Show Label Properties and adjust the Font to show the maximum surcharge depth.

E-mail me when people leave their comments –

You need to be a member of SWMM 5 or SWMM or EPASWMM and SWMM5 in ICM_SWMM to add comments!

Join SWMM 5 or SWMM or EPASWMM and SWMM5 in ICM_SWMM

Comments

  • Good TIP. Thanks. [ also a valuable reminder or this generic capability]
This reply was deleted.