You can also make a table and map of the differences between the existing and future scenario. The red in the image shows the pipes in which the flows have increased and the blue shows the pipes in which the flows have decreased between the existing and future scenarios. You make the table by
1. Making a conduit report for both scenarios at the same date/time,
2. Copy the flow in the link for all links to Excel and make a new column with the difference between the future and existing conditions,
3. Make a new column in the Conduit Information Table of InfoSWMM for real data and paste the new column from Excel into the Conduit Information Table,
4. You then can use Map Display for links and show a Map Display of the flow differences at that particular date/time for all the links.
You can also make a table and map of the differences between the existing and future scenario. The red in the image shows the pipes in which the flows have increased and the blue shows the pipes in which the flows have decreased between the existing and future scenarios. You make the table by
1. Making a conduit report for both scenarios at the same date/time,
2. Copy the flow in the link for all links to Excel and make a new column with the difference between the future and existing conditions,
3. Make a new column in the Conduit Information Table of InfoSWMM for real data and paste the new column from Excel into the Conduit Information Table,
4. You then can use Map Display for links and show a Map Display of the flow differences at that particular date/time for all the links.