Runoff Routing Options Example in SWMM 5

Subject:   Runoff Routing Options Example in SWMM 5

 

There are six options for runoff routing in SWMM 5:

 

·         All Runoff to an Outlet Node

·         All Runoff to another Subcatchment

·         All Runoff to the Pervious Area of the Subcatchment or other Subcatchment

·         All Runoff to the Impervious Area of the Subcatchment or other Subcatchment

·         Partial Runoff to the Pervious Area of the Subcatchment or other Subcatchment

·         Partial Runoff to the Impervious Area of the Subcatchment or other Subcatchment

 

The attached example SWMM 5.0.022 file has three catchments in a chain, the 1st Subcatchment Routes to the Pervious area of the 2nd Subcatchment and the 2nd Subcatchment routes the runoff to the Impervious area of the 3rd Subcatchment which routes all runoff to an outlet node.

 

Image001

RunoffRoutingOptions.inp Download this file

E-mail me when people leave their comments –

You need to be a member of SWMM 5 or SWMM or EPASWMM and SWMM5 in ICM_SWMM to add comments!

Join SWMM 5 or SWMM or EPASWMM and SWMM5 in ICM_SWMM