Comments
It might be possible to do this if you send me your model. I need the mxd file and ISDB folder. The message you are getting is that the BASE scenario cannot be changed if there are child scenarios.
Hi, you can use the invert of the pipes as the offset elevations for the force main. For example, if the pump wet well invert is 10 feet and the force main invert is at 14 feet you should enter 4 feet as the offset depth of the force main at the downstream end of the link.
The node of the force mains should have a surcharge depth so that the force mains will be under pressure.