Subject: What is Node Convergence in SWMM 5?
If a link has converged within two iterations then the hydraulic computations will be bypassed for the link in new iterations. A link is deemed converged if BOTH the upstream and downstream node depth has converged between successive iterations as long as two iterations have occurred during the time step. The nodes are considered converged if the depths between successive iterations is less than the stop tolerance of the program (the default stop tolerance is 0.005 inches). The new node depths are ALWAYS computed for each iteration but the links connected to the converged nodes may bypass computations and save on simulation time. Note: If the nodes ever become non converged after 2 iterations then the link flows will be computed.
Comments