I am working on one example project using SWMM model and I have been able to run the project and export the pre and post flow statistics report on excel sheet. The next step is to create Flow Duration table as shown on the attached table called: Flow Duration-Table.
The Green columns on the attached image are the ones that I have difficulty to figure out what equation or probability formula that I have to use to calculate “ Pre-projects Hours and Post-project Hours.
I really do need help to figure out how to get the values for these two columns in order to find out whether the model will pass or fail.
Replies
Hi Dear
Excellent. Thank you for your cooperation.
Highlight the column you want to copy, go to Edit, Copy the to Clipboard and then paste it in Excel
Hi Robert,
I am working on one example project using SWMM model and I have been able to run the project and export the pre and post flow statistics report on excel sheet. The next step is to create Flow Duration table as shown on the attached table called: Flow Duration-Table.
The Green columns on the attached image are the ones that I have difficulty to figure out what equation or probability formula that I have to use to calculate “ Pre-projects Hours and Post-project Hours.
I really do need help to figure out how to get the values for these two columns in order to find out whether the model will pass or fail.
Thank you in advance for your help