LID Placement and control session

hello all.i run a model containing 41 sub catchments and want to see the runoff Peaks from 24 years simulated rainfall data.finally i got two sub-catchs(S80 & S81) result around 4 cms and i had to do LID placement in both catchs and i do place 4 TO 5 type of LID(GR,BC,PP,IT and vegitation swale).but when i run the model again i see no change in runoff reduction of those two subcatchments.

You need to be a member of SWMM 5 or SWMM or EPASWMM and SWMM5 in ICM_SWMM to add comments!

Join SWMM 5 or SWMM or EPASWMM and SWMM5 in ICM_SWMM

Email me when people reply –

Replies

  • Hello Teamir, What is your percent impervious capture going to each of the LID's on the Subcatchment?

This reply was deleted.