Subject: Low Impact Development Options in H2OMAP SWMM and InfoSWMM
The five options are:
1. Rain Barrel
2. Bio Retention Cell
3. Infiltration Trench
4. Vegetative Swale
5. Porous Pavement
and can be entered as controls in the Hydrology Section of the Operations Browser of H2OMAP SWMM or InfoSWMM (Figure 1)
Replies