Rain off modeling

I am trying to model rain off structure like parallel spillway before WWTP (actually, it goes to sewer network but it's the same).

I am using weir (is it correct - Sideflow option??? ), and would like to add dimension of straight weir and of whole structure, such as length of weir, it's height, area of structure before weir to determine volume of water before WWTP entrance. Also, would like to model space (like retention space) after weir where water (part that goes over weir) stands before entering pipe that leads to river or something else, so I can control flow that goes out of structure to recipient, because I don't want to put huge flow to small channel immediately. Or it should be made with weir - oriffice combination? Oriffice after weir, for rain off water? Or should I use Storage unit for inflow and then weir for rain off water? In that situation I cannot enter Storage - Weir structure because it's actually the same structure, but length of weir is actually length of Storage unit. I can calculate area of Storage unit and enter it, with length of weir being one part of Storage area and calculating other one. Would that be OK?

Area between WWTP and weir and area after weir before channel concerns me - is SWMM capable of modeling that kind of structure?
Flow until some level would go to WWTP and bigger, when rain occurs; would go over spillway directly through channel to recipient. Of course, some height-flow relation would be calculated and entered.

I know I complicated it a bit :) I made a small scheme of a structure, I have attached it to be more clear.
Also, I made a small scheme how would I try to model it in SWMM, I think that should be OK.

Thanks!

You need to be a member of SWMM 5 or SWMM or EPASWMM and SWMM5 in ICM_SWMM to add comments!

Join SWMM 5 or SWMM or EPASWMM and SWMM5 in ICM_SWMM

Email me when people reply –

Replies

  • Mr Robert, did You maybe look at diagram above? Any suggestions?

    Thanks!

  • Also, now I am considering option where spillway would be vertical on main flow (It's much easier to calculate in excel or something else), positioned above outlet pipe where rain water would again go over weir to recipient channel, and septic water to WWTP.

    Seems like similar to calculate in SWMM, but other one is easier to calculate on paper or excel.

  • Thank You very much. If you have a different idea, please share it here; I would be glad to hear another opinion.

  • Your graphics are very good and SWMM 5 can handle the after weir area - I need to look at your node/link diagram to make suggestions about how to model your system.